Ir al contenido
CNPS.COMInnovando para el futuro de la energía
Inicio
Soluciones
Petróleo y gasProductos tubulares OCTGRecuperación mejorada (EOR)Registro de lodosCementaciónPerforación y terminaciónProducciónEnergía renovableSoluciones no metálicas
ProductosEmpresaRecursosContactoSolicitar cotización
Menú
InicioSolucionesPetróleo y gasProductos tubulares OCTGRecuperación mejorada (EOR)Registro de lodosCementaciónPerforación y terminaciónProducciónEnergía renovableSoluciones no metálicasProductosEmpresaRecursosContactoSolicitar cotización
Inicio/Purchaser Inspection for API Low Pressure Fiberglass Line Pipe and Fittings

Purchaser Inspection for API Low Pressure Fiberglass Line Pipe and Fittings

Publicado el 6 de agosto de 2022

1 Inspection Notice

Where the inspector representing the purchaser desires to inspect this product or witness these tests, reasonable notice shall be given of the time at which the run is to be made.

2 Plant Access

The inspector representing the purchaser shall have unrestricted access at all times while work on contract of the purchaser is being performed, to all parts of the manufacturer’s plant which will concern the manufacture of the product ordered. The manufacturer shall afford the inspector all reasonable facilities to satisfy him that the product is being manufactured in accordance with this specification. All inspections should be made at the place of manufacture prior to shipment, unless otherwise
specified on the purchase order, and shall be so conducted as not to interfere unnecessarily with the operation of the works.

3 Compliance

The manufacturer is responsible for complying with all of the provisions of this specification. The purchaser may make any investigation necessary to satisfy himself of compliance by the manufacturer and may reject any material that does not comply with this specification.

4 Rejection

Unless otherwise provided, material which shows defects on inspection or subsequent to acceptance at the manufacturer’s works, or which proves defective when properly applied in service, may be rejected, and the manufacturer so notified. If tests that require the destruction of material are made, any product which is proven to have not met the requirements of the specification shall be rejected. Disposition of rejected product shall be a matter of agreement between the manufacturer and the purchaser.

CNPS.COM Limited

Equipos y soluciones para las industrias energética, petrolera, gasífera y de materiales avanzados.

Dongying, provincia de Shandong, China

sales@cnps.com

+86 183 5463 9099

Soluciones

Petróleo y gasProductos tubulares OCTGRegistro de lodosSoluciones no metálicasEnergía renovable

Recursos

ArtículosProductosEmpresaContactoSolicitar cotización

Sitios CNPS

EnglishDeutschFrançaisEspañol
© 2026 CNPS.COM Limited. Todos los derechos reservados.CNPS.COM